Skip to main content

Posts

Showing posts from August, 2016

Lake Condition update - August 28, 2016

Meritage Homes received dredging plans from Edge Environmental and Dragonfly Pond Works (DPW).  It decided to award the contract to DPW.  DPW’s pump-dredging approach allows them to remove the silt (sediment) without draining the forebay.  (In pump dredging the silt is sucked up by a nozzle held against it and sent into water-permeable membrane bags which let the water drain out but hold the solids.)   DPW plans to locate the permeable bags in low areas adjacent to the forebay.  These areas often flood during heavy rain events.  After the water has permeated out of the bags, DPW will open the bags, use the dried solids to fill-in these low areas and then stabilize the fill dirt with vegetation cover. DPW expects to do the dredging in early October.  

New Process & Schedule for 2016 Annual Meeting

Homeowners, check your mailboxes—you’ll find important information about this year’s annual meeting inside! The Parkwood Board has approved changes to the voting process for the upcoming annual meeting to be held in September. AUGUST 4th, 2016 By August 4th each member should have received in the mail a list of open director’s positions and a nomination form, along with a description of the duties and responsibilities of directors. Additionally, homeowners will be given the opportunity to propose any motions that they want presented to the members attending the September annual meeting. AUGUST 17th, 5pm These nomination forms and proposed motions will need to be returned by mail or dropped off at the office on or before August 17, 2016. After compiling the nominations and voting on the proposed motions the board will mail a ballot and proxy designation forms to each Parkwood homeowner. AUGUST 22nd, 2016 These ballots and proxy forms will be mailed on August 22nd. SEPTEMBER 2,...